Simple Math of Labor Savings

What would it be worth for your company to improve your field productivity?

D. Brown Management Profile Picture
Share

 

Field Productivity: The 12 Month Challenge for Basic Labor Savings.
  • If you are a specialty contractor directly responsible for field labor?
  • If you are a general contractor managing dozens of specialty contractors?  
  • If you are a project owner?  

There is an incredible amount of low-hanging fruit to be picked when it comes to improving labor productivity before you even start to get into improvements from:

Those are major enhancers to field productivity but just imagine the savings you can achieve from improving:  


Improving Field Productivity Workshop - Revamped for 2018


Simple Math of Labor Savings
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Simple Math of Labor Savings
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Job Instruction (JI): A 1940s Solution to the Craft Labor Shortage
The shortage of qualified craft labor, crew leaders, and supervisors has been solved before - just not in our lifetimes. The lessons from the Training Within Industry (TWI) and specifically the Job Instruction (JI) training can be used by any contractor.
Simple Math of Labor Savings
What would it be worth for your company to improve your field productivity? There is an incredible amount of low-hanging fruit to be picked when it comes to improving labor productivity.
Time-on-Tools and Minimum Required Installation
Labor productivity IS NOT the biggest problem with field productivity. Under similar conditions the variation in how fast two crafts people actually “turn wrenches” is about 2X but there are far bigger problems to tackle. Focus on these three areas.