Project Delivery - Integrated Project Delivery

Integrated Project Delivery (IPD) can be the best method for a project if the culture and competencies of all parties, including the Project Owner, are all aligned.

D. Brown Management Profile Picture
Share

In this project delivery method, the Architect and CM+GC, along with key consulting engineers and key specialty contractors, are all bound by the same contract with the owner. 

CM at Risk: Project Delivery Methods - Definition of Integrated Project Delivery and pros and cons.

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Higher Scores Aren’t Always Better: Percent Planned Complete (PPC) Example
Construction is full of competitive personalities - more is always better. This is not always the case, and you must be careful when setting targets that your goals don't have unintended consequences. Percent Planned Complete (PPC) is a perfect example.
Lean Principle - 3 Enemies of Lean
Profitable growth comes from operating within a target capacity and capability range - and continually increasing those ranges. Operating with consistent overload, consistent under capacity, or with consistently high variability is not sustainable.
Project Delivery - Integrated Project Delivery
Integrated Project Delivery (IPD) can be the best method for a project if the culture and competencies of all parties, including the Project Owner, are all aligned.