Project Delivery - Design-Build

In the Design-Build method the project owner has a single contract with the general contractor who then has contracts with the architect and trade contractors.

D. Brown Management Profile Picture
Share

The Design-Build method of project delivery eliminates a couple of the major negatives inherent in the Design-Bid-Build method.

CM at Risk: Project Delivery Methods - Definition of Design-Build and pros and cons.

This integrates construction and design by putting the contractor fully in charge of the process which shortens delivery timelines and substantially cuts change orders.  

A study by Penn State and the Construction Industry Institute (CII) in 1997 showed many of the advantages of the Design-Build method, which are summarized in these slides from the Design-Build Institute of America (DBIA).

The key downsides of Design-Build include:

  • The project owner loses direct control over the design and must directly manage value vs. cost decisions.

  • The project owner must have clear and complete decisions on the scope of the project very early on.  

  • The project owner is responsible for changes and gaps in the scope. Deeply understanding the architectural design process and knowing how to manage it is a critical skill for any contractor delivering preconstruction services.  

Project Delivery - Design-Build
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Project Delivery - Design-Build
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Observe, Orient, Decide, and Act (The OODA Loop)
The OODA Loop is a decision-making framework originally developed for the military to make agility a competitive advantage. The focus on fast, localized decisions in rapidly changing environments aligns well with construction projects and businesses.
5D Process for Alignment, Development, and Execution Speed
Effectively building a project and a construction business starts with getting the right people on the team and then getting them aligned. A great behavior to build into the team for alignment is a disciplined approach focusing on the 5Ds.
Closing Knowledge Gaps - The Formula
Here is the “magic” formula for closing the knowledge gap from where you are to where you want to be!