Failure is a Potent Teacher

Failure is a very potent teacher for construction contractors if:

D. Brown Management Profile Picture
Share
Leadership Tools: Failure is a Potent Teacher.
  • You don’t define failure just as CATASTROPHIC events that seriously damage your business.  
  • You define failure broadly as ANYTHING that is not adding value to the customer or slowing your progress.  
  • You embrace failure as part of the learning process diving deeply into the Root Cause Analysis (RCA). 
  • You develop a culture and systems so that everyone on the team thinks about the business as a series of interrelated cycles.  Consider all the interrelated cycles from the installation of a light fixture in the field to to the monthly project review meetings to the annual business planning process.  
  • Your whole team views each cycle as an opportunity to improve (PDCA)
  • You have developed structured processes for continuously updating your Standard Operating Procedures (SOPs) as your team learns then rolling them out across the company improving the whole team’s capabilities.  

Book Resources:

The Five Elements of Effective Thinking

Thinking in Bets

Related LinkedIn Posts:  

Churchill - Failure is NOT Fatal

Fail 9 Times to Succeed




Understanding the Construction Field Day
For a contractor to truly improve their field productivity, they must start with understanding how the time is spent. Depending on the trade, project, and the labor, study the time spent on actual installation ranges from 50-64%.
Stop Doing Things - Peter F. Drucker
The tendency as a leader’s role evolves is to keep adding things to their list of responsibilities and to their team. What’s important is to regularly pause and reflect about what you can STOP doing to allow for new ideas if they are really better.
Production Tracking - The Basics
Schedule + Production are two foundational key results the Foreman will achieve through their planning. The heart of any production measurement is simply “Earned Budget vs. Actual Cost”.