Conceptual Estimating - Turning Drawings Into Estimates

Conceptual estimating requires a contractor to take early stage conceptual drawings and turn them into detailed estimates with a Work Breakdown Structure (WBS) that is useful during the initial programming, schematic, and design development phases.

D. Brown Management Profile Picture
Share

It is important to remember that during these early stages, the developer is working to put together financing for the project.   

CM at Risk: Conceptual Estimating Technology.

There is a lot of risk for all parties in a new development and as with any type of financing, banks are looking at the 5Cs with covenants, just a like a contractor has on their credit line.

The difference between a project moving forward or not is often in the single-digit percentage on cost and revenue projections. With construction costs being about half the total cost of the development, it is critical that the contractor can create a realistic budget even at this early stage.  

  • Too high of a plug number and the development won’t pencil out for cash flow. They will likely source a second opinion from another contractor or pull the plug on the development. 
     
  • Too low of a plug number and it won’t be constructable. Raising the number later in the process may cause the financing to get pulled from the project.  

  • That budget must be detailed in a way that is truly useful for the project owner, architect, consulting engineers and contractor to make good decisions during the schematic, design development, and construction document phases.  

The better a contractor is at this, the earlier and more often they will be brought into the process. 


Conceptual Estimating - Turning Drawings Into Estimates
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Conceptual Estimating - Turning Drawings Into Estimates
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Leading Growth through Building People
Southwest disrupted the airline industry by a relentless focus on building their people around a culture of fun, hard work, and hands-on leadership. Contractors with that same level of focus on their people and culture will dominate the industry tomorrow.
Setting Standards and the Feedback Loop
Set the standard. Train to the standard. Certify to the standard. Plan the work to the standard. Execute to the plan and the standard. Check against the standard. Make prioritized improvements to the standard, training, planning, and execution.
Valuation Math - Multiple of Earnings
In a valuation, you will often hear the term multiple of earnings. This is usually calculated based on some average of the last 3-5 years earnings and weighted toward the more current years.